Full Project – THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME

Full Project – THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME

 

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE
INTRODUCTION
1.1   BACKGROUND TO THE STUDY
The construction industry has recently witnessed a paradigm shift from traditional paper-based method of service delivery to electronic information exchange using Information Technology (IT), at least in the western world like UK. It is now evident that the adoption of Information Technology can enhance construction productivity and improve communications for effective decision-making and coordination among construction participants. The ability of the industry to avail itself of technology depends on the level of usage by construction participants including the Quantity Surveyor (QS) who plays a major role in the management of project success determinants, such as cost, time and quality.

It is apparent that we live in a dynamic world characterized by incessant technology change. The explosive growth of information and communication technology (ICT) otherwise shortened as information technology (IT) has had unquantifiable impact on business systems and processes (Rivard et al., 2004). Advancement in information technology has made possible fundamental changes in the method of practice in all businesses and industries although at different levels (Li, 2000). The global acceptance and widespread adoption has accelerated the dimensions of competition not only among organizations globally but among professions locally (Hampson and Tatum, 1994).

The construction industry with the aim of leveling their colleagues in other industries have embraced the use of information technology such as internet, computing, telephoning, satellite communication and electronic mailing to perform most, if not all of their activities (Ibidapo, 2000). The quantity surveyors’ ability to avail themselves of these emerging opportunities provided by the advent of information technology depends on the adoption of new technologies (Castle, 2002). There is quite a lot of development in all areas of computer application to the industry. Of note are the expert systems, artificial intelligence, knowledge-base systems (KBS), artificial neural networking (ANN), robotics and computer aided design (Arif and Karam, 2001). Rivard et al. (2004) opined that the evolution of information technology will have a profound impact on how organizations in the architectural, engineering and construction industry operate in the way other industries such as manufacturing and banking have adopted and benefited from long ago. He noted that this is already the case in many of the developed countries around the world. In lieu of this, Honey (1998) reported that the turn of the last century has seen a reduction in paper-based operation in quantity surveying (QS) offices in UK while electronic led-processes are leading to less dependence on taking-off sheets and other ancillary stationery. The quantity surveying profession in Nigeria has experienced significant changes over the past decade in terms of the scope and type of services provided within the construction industry (Oladapo, 2006). These changes have occurred primarily in response to changing industry/client demands, information technology developments, increased levels of competition for services and the vital role of the quantity surveying in achieving improved service delivery. Moreover, given the increasingly global nature of construction industry obstinate by extremely high levels of domestic competition and resultant low profit margin levels, there is no doubt that the construction industry has to improve its information flow and project delivery mechanism (Wager, 1998). Thus, as information flow increasingly become electronic, quantity surveying computing facilities, software and databases will need to develop in a compatible manner. Nigerian quantity surveyors will need to adapt to changes in work patterns to improve their efficiency and develop new markets to maintain competitive advantage and enhance profitability through the adoption of IT. In summary, the Nigeria construction industry in general and the quantity surveying profession in particular are facing the challenges of effectively utilizing the rapid expanding technological environment in which it operates to its full advantage (Oyediran and Odusami, 2004).

1.2   STATEMENT OF THE PROBLEM
It is a known fact that advancement in technology and evolution of information technology as dramatically change the way business is conducted by various professionals. It has reduced the cost of services, reduces labour and saves time. The quantity surveying profession are not left behind, they have also embraced the use of this advanced form of technology in delivering their services. The researcher is therefore examining the effect of this technology in the field of quantity surveying and how it affect cost, labour and time.
1.3   OBJECTIVES OF THE STUDY
The following are the objectives of this study:

  1. To examine the effect of technology in the field of quantity surveying.
  2. To examine how technology affects cost, labour and time in the field of quantity surveying.
  3. To examine the factors limiting the use of technology in the field of quantity surveying

1.4   RESEARCH QUESTIONS

  1. What is the effect of technology in the field of quantity surveying?
  2. How does technology affects cost, labour and time in the field of quantity surveying?
  3. What are the factors limiting the use of technology in the field of quantity surveying?

1.6   SIGNIFICANCE OF THE STUDY
The following are the significance of this study:

  1. The outcome of this study will educate the stakeholders in the quantity surveying profession on the effect of technology in the field of quantity surveying with particular focus on how it affects cost, labour and time.
  2. This research will be a contribution to the body of literature in the area of the effect of personality trait on student’s academic performance, thereby constituting the empirical literature for future research in the subject area.

1.7   SCOPE/LIMITATIONS OF THE STUDY
This study will cover the effect of technology use in the field of quantity surveying
LIMITATION OF STUDY
Financial constraint– Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).
Time constraint– The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME